Monday, 18 March 2013

Window Cubby Hole Area...

Currently in development is the extrusion from the main corridor to the window which has an interesting transition between them.

Below are some development shots with Sam's recent texture work:



Materials need a lot of work, the brick tiling on the frame transition between window cubby hole and corridor needs tuning. 

Next up will be the completion and tidying of the whole window area.


No comments:

Post a Comment